Evaluasi Penjadwalan Proyek Pengembangan Rumah Sakit Mitra Husada Pringsewu

DOI: https://doi.org/10.14710/mkts.v23i1.14729

Article Metrics: (Click on the Metric tab below to see the detail)

Article Info
Submitted: 18-05-2017
Published: 28-07-2017
Section: Articles
Fulltext PDF Tell your colleagues Email the author

Project is a unique sequence of interrelated activities to achieve particular result and done in particular time period. Due to time and budget limitation, management undertaking of a project needs to be evaluated by using a special method in order to avoid loss and retardation. CPM and S Curve are among evaluation methods. This study was to identify network, critical activities, critical event, critical line and to analyze optimum cost and duration of VVIP Building development project of Mitra Husada Hospital Pringsewu with time acceleration to avoid retardation. Result showed that after S Curve Evaluation done, implementation cost could be reduced 10% lower than realization cost from IDR 12,423,077,000.00 to be IDR 11,293,707,000.00. Mean while, after acceleration by using CPM method, the critical line decreased from three to one line and project duration shortened from 448 days to be 360 days. Evaluation of projects using the S Curve and with the CPM shows a simple way of evaluation and can be done by various actors of construction.


Keywords

Critical activities, critical events, critical line, optimum duration, optimum cost,CPM Method – S Curve

  1. Weka Indra Dharmawan 
    Prodi Teknik Sipil Fak. Teknik Universitas Malahayati Lampung Jl. Pramuka No. 27 Kemiling Bandar Lampung, Indonesia
    Prodi Teknik Sipil Fak. Teknik Universitas Malahayati Lampung

  2. Devi Oktarina 
    Dosen Prodi Teknik Sipil Fak. Teknik Universitas Malahayati Lampung Jl. Pramuka No. 27 Kemiling Bandar Lampung, Indonesia
    Prodi Teknik Sipil Fak. Teknik Univ. Malahayati Lampung
  3. Tito Catur Wibowo 
    Prodi Teknik Sipil Fak. Teknik Universitas Malahayati Lampung Jl. Pramuka No. 27 Kemiling Bandar Lampung, Indonesia
    Prodi Teknik Sipil Fak. Teknik Universitas Malahayati Lampung