BibTex Citation Data :
@article{GT19152, author = {Zulfaidah Ariany}, title = {ANALISA PERHITUNGAN BALLAST PADA PELUNCURAN MENYAMPING (SIDE LAUNCHING) KAPAL SUNGAI 200GT DI PT. DKB (PERSERO) CABANG SEMARANG}, journal = {Gema Teknologi}, volume = {19}, number = {4}, year = {2018}, keywords = {Launching; Side Launching; Ballast;}, abstract = { Considering the risk faced in the side launching, limited land from the shipyard so that required calculation and analysis in the implementation of the launching. The purpose of this research is analyzes and counting ballast (a counterweight ) used in a river boat lct 200 GT on the launching of sideways ( side launching ) so that safe and floats can be perfect in water, as nown that the launching of is one of the stages important in the development process the new vessel which have prepared to be operated, formerly preceded by stage first cutting plate ( cutting first steel plate ) and the keel laying ( laying ) keel of a ship. Before the handover of a vessel is carried, a ship will had some sea trial. The results of this research is scientific publication in national journal , as a input for the shipyard to implement the launch sideways safe as well as the basis for students and teachers included in matter basic lecture subjects of case in point in lecture the theory ship building. }, issn = {2656-582X}, pages = {19--23} doi = {10.14710/gt.v19i4.19152}, url = {https://ejournal.undip.ac.id/index.php/gema_teknologi/article/view/19152} }
Refworks Citation Data :
Considering the risk faced in the side launching, limited land from the shipyard so that required calculation and analysis in the implementation of the launching. The purpose of this research is analyzes and counting ballast (a counterweight ) used in a river boat lct 200 GT on the launching of sideways ( side launching ) so that safe and floats can be perfect in water, as nown that the launching of is one of the stages important in the development process the new vessel which have prepared to be operated, formerly preceded by stage first cutting plate ( cutting first steel plate ) and the keel laying ( laying ) keel of a ship. Before the handover of a vessel is carried, a ship will had some sea trial. The results of this research is scientific publication in national journal , as a input for the shipyard to implement the launch sideways safe as well as the basis for students and teachers included in matter basic lecture subjects of case in point in lecture the theory ship building.
Article Metrics:
Last update:
Last update: 2024-11-12 01:31:56
The Authors submitting a manuscript do so on the understanding that if accepted for publication, copyright of the article shall be assigned to Gema Teknologi Journal and Vocational School of Diponegoro University as the publisher of the journal. Copyright encompasses rights to reproduce and deliver the article in all form and media, including reprints, photographs, microfilms, and any other similar reproductions, as well as translations.
Gema Teknologi Journal, Vocational School of Diponegoro University and the Editors make every effort to ensure that no wrong or misleading data, opinions or statements be published in the journal. In any way, the contents of the articles and advertisements published in Gema Teknologi Journal are sole and responsibility of their respective authors and advertisers.