BibTex Citation Data :
@article{GT90342, author = {Melissa Rahmawati Yusuf and Eko Ariyanto}, title = {Rancang Bangun Alat Monitoring Breaker Motor 3 Fasa Berdasarkan Konfigurasi Breaker PLTU UBP Priok Dengan Pengukuran Keserempakan Serta Tegangan Secara Real-Time Berbasis Modul Optocoupler AC Serta Sensor ZMPT101B Dan Internet Of Things}, journal = {Gema Teknologi}, volume = {23}, number = {2}, year = {2026}, keywords = {ZMPT101B Sensor, AC Optocoupler Module, Breaker Synchronization}, abstract = { This monitoring system was designed to automatically detect breaker status based on 24V DC voltage, utilizing a 25V DC sensor. The system is capable of transmitting real-time data with an average response time of 9 seconds. The ZMPT101B voltage sensor used in the setup demonstrated low error rates, with 0.97% for phase R, 0.91% for phase S, and 0.58% for phase T. Additionally, an AC optocoupler module was employed to detect 220V AC, enabling accurate synchronization measurement. Results indicate that synchronization during the \"on\" condition is highly accurate, although a slight delay was observed during the \"off\" condition due to residual current in the signal amplification transistor (S8050) located within the module. Testing at the Priok UBP Combined-Cycle Power Plant confirmed that the system meets the company's configuration standards, with an obtained the best value of 2 ms with average time of 3.2 ms, suggesting that the breakers operate within optimal parameters. Overall, the system performs effectively and aligns with the company’s operational requirements. }, issn = {2656-582X}, pages = {56--68} doi = {10.14710/gt.v23i2.90342}, url = {https://ejournal.undip.ac.id/index.php/gema_teknologi/article/view/90342} }
Refworks Citation Data :
This monitoring system was designed to automatically detect breaker status based on 24V DC voltage, utilizing a 25V DC sensor. The system is capable of transmitting real-time data with an average response time of 9 seconds. The ZMPT101B voltage sensor used in the setup demonstrated low error rates, with 0.97% for phase R, 0.91% for phase S, and 0.58% for phase T. Additionally, an AC optocoupler module was employed to detect 220V AC, enabling accurate synchronization measurement. Results indicate that synchronization during the "on" condition is highly accurate, although a slight delay was observed during the "off" condition due to residual current in the signal amplification transistor (S8050) located within the module. Testing at the Priok UBP Combined-Cycle Power Plant confirmed that the system meets the company's configuration standards, with an obtained the best value of 2 ms with average time of 3.2 ms, suggesting that the breakers operate within optimal parameters. Overall, the system performs effectively and aligns with the company’s operational requirements.
Article Metrics:
Last update:
Last update: 2026-11-05 12:43:49
The Authors submitting a manuscript do so on the understanding that if accepted for publication, copyright of the article shall be assigned to Gema Teknologi Journal and Vocational School of Diponegoro University as the publisher of the journal. Copyright encompasses rights to reproduce and deliver the article in all form and media, including reprints, photographs, microfilms, and any other similar reproductions, as well as translations.
Gema Teknologi Journal, Vocational School of Diponegoro University and the Editors make every effort to ensure that no wrong or misleading data, opinions or statements be published in the journal. In any way, the contents of the articles and advertisements published in Gema Teknologi Journal are sole and responsibility of their respective authors and advertisers.