skip to main content

Analysis of Material Supplier Selection in Laminated Bamboo Shipyards Using the Analytical Hierarchy Process Method

Abdul Rachman Safarudin  -  Department of Naval Architecture, Faculty of Marine Technology, Sepuluh Nopember Institute of Technology, Surabaya 60111, Indonesia, Indonesia
*Heri Supomo scopus  -  Department of Naval Architecture, Faculty of Marine Technology, Sepuluh Nopember Institute of Technology, Surabaya 60111, Indonesia, Indonesia
Wikaranosa Scotiandharu Supomo  -  Baito Deling Research Centre, Surabaya, Indonesia
Open Access Copyright (c) 2023 Kapal: Jurnal Ilmu Pengetahuan dan Teknologi Kelautan
Creative Commons License This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.

Citation Format:
Abstract
The material supply chain is an essential part of the shipbuilding industry. For this reason, it is necessary to select suppliers who can support the material needs of ship production. Qualitative and quantitative factors are multi-criteria problems in supplier selection. The Analytical Hierarchy Process (AHP) method effectively determines an integrative approach to supplier selection. This research is applied to a laminated bamboo shipyard to evaluate several companies that can be used as material suppliers. The analysis was carried out using expert choice software by calculating the weight of each criterion and sub-criteria. The analysis results obtained the priority of the primary material supplier with the Kediri area (S1) as the supplier of bamboo material for ship construction with a global weighting value of 0.363. PT. An (S5) located in the Surabaya area is the next top priority as a supplier of adhesive and finishing 1st material components with global weighting values of 0.434 and 0.427, respectively. PT. E (S9) is located in the Semarang area as a priority supplier of finishing 2nd material components with a global weighting value of 0.490. UD. G (S11) is located in the Surabaya area as a priority supplier of ship mold components with a global weighting value of 0.456. In addition, UD. J (S14), located in the Surabaya area, is a priority supplier of material components for clamps, sanding, and cutting blades with a global weighting value of 0.496 and 0.351.
Fulltext View|Download
Keywords: Supply chain; Laminated bamboo shipyard; Supplier; Analytical Hierarchy Process

Article Metrics:

Last update:

No citation recorded.

Last update: 2024-12-28 21:48:26

No citation recorded.