skip to main content

Penerapan Produksi Bersih pada Proses Painting Steel Sebagai Upaya Minimasi Limbah (Studi Kasus Pada Industri Perakiton Sepeda Motor)

1Jurusan Teknik Lingkungan, Indonesia

2Fakultas Teknik Universitas Diponegoro, Indonesia


Citation Format:
Abstract

Abstract

 

Painting Steel process in some automotive industries uses Spray methode, but this

methode produce more liquid waste and solid waste. Waste minimization that can be

done by Cleaner Production through implementation of Cotionic Electro Deposition

(CED) methode. This methode has a purpose to reduce liquid waste and solid waste

to achieve minimum environmental effects. After a comparization beetwen Spray

methode and CED methode based on the amount of production, paint consumption,

watter consumption, electrical consumption, man power consumption ond waste from

the production, the result is CED methode has more economical benefit as much as

Rp 556.736. 178,00/month. This analyz  doesn't  snatch investment.

 

Key words : Cleaner Production, Spray methode, CED methode, saving

 

Fulltext View|Download

Article Metrics:

Last update:

No citation recorded.

Last update: 2024-11-15 20:23:43

No citation recorded.