Analisis Optimalisasi Desain pada Proyek Pembangunan Jalan Tol Bayung Lencir - Tempino Seksi 1
DOI: https://doi.org/10.14710/teknik.v45i2.64329
Abstract
Keywords
Full Text:
PDF (Bahasa Indonesia)References
Aziz, R. M., Nasreldin, T. I., & Hashem, O. M. (2024). The role of BIM as a lean tool in design phase. Journal of Engineering and Applied Science 71(23), 1–20. https://doi.org/10.1186/s44147-023-00340-3.
Bakry, I., Moselhi, O., and Zayed, T. (2014). Optimized acceleration of repetitive construction projects. Automation in Construction 39, 145–151. https://doi.org/10.1016/j.autcon.2013.07.003.
Badan Geologi. (2019). ATLAS Sebaran Batu Lempung Bermasalah Indonesia. Bandung: Badan Geologi - Kementerian Energi dan Sumber Daya Mineral.
Bian, X., Liu, S., Duan, X., Jiang, J., & Chen, Y. (2024). Dynamic soil arching effect in pile-supported embankment due to train passages at high speeds.” Soil Dynamics and Earthquake Engineering 181, 108690. https://doi.org/10.1016/j.soildyn.2024. 108690.
Pusat Vulkanologi dan Mitigasi Bencana Geologi. (2022). ATLAS Tapak Lokal (Vs30) Indonesia Berdasarkan Klasifikasi Geomorfologi Teknik. Bandung: Pusat Vulkanologi dan Mitigasi Bencana Geologi, Badan Geologi - Kementerian Energi dan Sumber Daya Mineral.
Robertson, P. K. & Campanella, R. G. (1983). Interpretation of cone penetration tests. Part I: Sand.” Canadian Geotechnical Journal 20(4), 718–33. https://doi.org/10.1139/t83-078.
Samy, M. N., Ahmed, A. A., Fayed, A. L., Sorour, T., & Hammad, M. S. (2023). Installation effect of rigid inclusions in soft clay improvement. Ain Shams Engineering Journal, 14(11), 102552. https://doi.org/10.1016/j.asej.2023.102552.
SNI 1725:2016. (2016). Pembebanan untuk jembatan. Jakarta: Badan Standardisasi Nasional.
Yanto, F. H. (2023). Strength analysis of formwork using falsework flying system on slab-on pile structure. International Journal for Computational Civil and Structural Engineering, 19(4), 208–221. https://doi.org/10.22337/2587-9618-2023-19-4-208-221.
Zaika, Y., Kololikiye, G. R., and Harimurti. (2023). The PVD-accelerated soil deposit consolidation based on elliptic cylindrical model. Civil Engineering Journal 9(7), 1660–68. https://doi.org/10.28991/CEJ-2023-09-07-08.
Copyright (c) 2023 TEKNIK